Full Flex GOLD Step-by-Step Installation
 
1st Step
 
Locate the vehicle injection nozzle connectors.
 
 
2nd Step
 
Release the vehicle injection nozzle connectors.
 
 
3rd Step
You have two conectors, male and female on the Full Flex wiring loom for each cylinder.
 
 
4th Step
 
Disconnect main cable from injector head, connect female connector into injector slot connect male connector into main cable forming a “Y” bipass.
 
 
5th Step
 
Connect the Full Flex GOLD black wire to the negative terminal on the battery.
 
6th Step
 
The Cold Start temperature sensor should be connected to one of the screws on
the valve cover (camshaft).

 
 
7th Step
 
Check if all vehicle and Full Flex GOLD connectors are plugged. In fasten the device box near the vehicle battery using a double-faced tape.
 
 
8th Step
 
Full Flex comes with factory regulations for each vehicle. If there is any need to chance the regulation to imprune performance and economy. Full Flex has a dip switch with (4) settings of function.
Always consult the Techincal Department or garage before performing any ajustments.

 
 
9th Step
 
After performing installation, the first fill up use 50% gasoline and 50% ethanol.
 
There you are! Your Full Flex GOLD is installed!