Full
Flex GOLD Step-by-Step Installation |
| |
| 1st
Step |
| |
Locate
the vehicle injection nozzle connectors. |
| |
| |
| |
| 2nd
Step |
| |
Release
the vehicle injection nozzle connectors. |
| |
|
| |
| 3rd
Step |
|
|
| You
have two conectors, male and female on the
Full Flex
wiring loom for each cylinder.
|
|
| |
|
| |
| 4th
Step |
| |
| Disconnect
main cable from injector head, connect female
connector into injector slot connect male
connector into main cable forming a “Y”
bipass.
|
|
| |
|
|
| |
| 5th
Step |
| |
| Connect
the Full Flex
GOLD black wire to the negative
terminal on the battery.
|
|
|
|
|
| |
| 6th
Step |
| |
The
Cold Start temperature sensor should be connected
to one of the screws on
the valve cover (camshaft).
|
|
| |
|
| |
| 7th
Step |
| |
| Check
if all vehicle and Full Flex GOLD
connectors are plugged. In fasten the device
box near the vehicle battery using a double-faced
tape.
|
|
| |
|
| |
| 8th
Step |
| |
| Full
Flex comes with factory regulations for each
vehicle. If there is any need to chance the
regulation to imprune performance and economy.
Full Flex has a dip switch with (4) settings
of function.
Always consult the Techincal Department or
garage before performing any ajustments.
|
|
| |
|
| |
| 9th
Step |
| |
| After
performing installation, the first fill up
use 50% gasoline and 50% ethanol. |
|
| |
There
you are! Your Full
Flex GOLD is installed! |